Renovation Contractor in Kolathur, Chennai

Planning a renovation in Kolathur? Iconiq Construction & Interior takes on renovation work in Kolathur, Peravallur, Villivakkam and Ayanavaram. This page covers what a renovation usually involves, how the scope is decided and what to check before you sign a quotation.

Start with the problem, not the finish. Seepage, weak electrical supply, repeated plumbing leaks and cracked flooring are usually signs of work that has to be done before tiles or paint. A site inspection lists these first, and the quotation separates essential repairs from optional upgrades.

A renovation involves several trades - civil work, plumbing, electrical, carpentry, tiling, waterproofing and painting. We handle them under one contract with one written schedule, so the sequence is planned once instead of being negotiated between contractors.

Full House Renovation

Scope is set room by room after inspection. Civil work, wiring, plumbing, flooring, bathrooms and painting are listed separately, so you can see which parts are essential and which can wait. Everything runs to a single written schedule.

Bathroom Renovation

The order of work matters: waterproofing of the sunken slab comes before plumbing, tiling and fittings, and ventilation is planned alongside. Rushing the waterproofing step is the usual cause of leakage later.

Kitchen Remodelling

Remodelling starts with the layout. Counters, cabinets, tiling, plumbing points and electrical points are re-planned together, so the kitchen works better rather than only looking newer.

Rewiring & Plumbing

Check the age of the wiring and pipes first. Old wiring may not suit today's electrical load, so replacement uses correctly rated cable and proper earthing, and corroded pipework is replaced instead of being patched again.

Waterproofing & Roof Treatment

Water entry is traced before any coating is applied. The terrace, bathroom sunken slab, external walls and cracks are checked, and the treatment is done at the source of the seepage.

Flooring & Tiling

Old flooring is removed, the base is levelled, and new vitrified tile, granite or marble is laid with skirting. When the house is occupied, dust control and room-by-room phasing keep it usable.

How We Work

Inspect First, Then Quote

Renovation goes wrong when the quotation is written before anyone has looked properly. We do it the other way round.

Site Inspection and an Itemised Quotation

We inspect the structure, wiring, plumbing and waterproofing, then quote each item separately so you can see what is essential and what is optional. Structural changes are referred to a qualified engineer before anything is agreed.

  • Free inspection and a written, line-by-line quotation.

Phased Execution with a Written Schedule

Where you are staying in the house we phase the work room by room with dust sheeting in place. A supervisor is on site daily and you get weekly progress against the written schedule.

  • Weekly progress updates, snag list cleared before handover.

FAQs

Frequently Asked Questions

It depends on the scope, not the area alone. Painting and flooring cost far less than a job that involves plumbing, wiring, bathrooms and structural changes. After an inspection you receive an itemised quotation, so every item can be compared or deferred.

Look for damp patches or seepage on walls and ceilings, old or overloaded wiring, leaking pipe joints or low water pressure, and cracks in walls or floors. Note them before the site visit; the inspection confirms which are cosmetic and which need repair first.

Not always. Single-room or finishing work can be phased room by room. A full renovation involving wiring, plumbing and several bathrooms may be faster with the house empty - typically three to five weeks - because the trades can work in parallel. We tell you which applies after the inspection.

For any change affecting the structure, a qualified structural engineer is involved before work begins, and load-bearing elements are not altered on a verbal assurance. Where CMDA or local body approval is required, we tell you at the quotation stage.

Compare them line by line. Check that waterproofing, electrical rating, plumbing replacement and finishing are each listed, and that the schedule is in writing. A lower total that leaves out essential items usually costs more later.